Kitchen Update

The kitchen is at last being progressed. As of today we have all the building works done, floor, ceiling, fake brick wallm lights, most of the cabinates assembled. Just needs surfaces adding, wiring up, plumbing for gas and sink etc. Also need 2 replacement ovens as the ones Wren sent are all dented and smashed.

Around the steel beam where they have covered the steel in plasterboard I am making an oak ‘L’ shaped piece. It is 10cm wide on each arm. Using some old oak left over from the stairs for this. I’ll post pics at some point.

Published
Categorized as DIY